INSTALLATION ANDOPERATING INSTRUCTIONSREFRIGERATOR FOR ELECTRIC OPERATIONNEA 1402USA Corporate Office CANADAService Office 2320 Industrial Parkway Elk
10START UP INSTRUCTIONS1. Press the main power ON/OFF key. If the real time clock has to be set the LED panel will show flashing horizon-tal bars ” --
11Status message1) Check the AC supply, fuses etc.2) The DC voltage has for 3 hour period been too low to start a defrost sequence.Check battery charg
12Manual defrostIf desired this refrigerator can be set to defrost manual at any time.Usually a defrost cycle takes about 1 hour but is depending on t
13HOW TO USE THE REFRIGERATORFOOD STORAGE COMPARTMENTThe food storage compartment is completely closed andunventilated, which is necessary to maintain
14ELECTRIC EQUIPMENTHEATERSThe heat necessary for the operation of an absorptioncooling unit is supplied by an electric heater mounted ina pocket of t
15FIG. 13CoverAdjusting screwIce levelbail armDownpositionFIG. 12ICE MAKERGENERAL INSTRUCTIONS ANDOPERATION1. The refrigerator must be connected to 12
166. Connect compressed air onto the inlet fitting of thewater solenoid valve. See FIG. 14. Apply AC powerto the solenoid valve by forcing the ice mak
17CERTIFIED VENT SYSTEM KITSREFRIGERATOR KITMODEL NO. COMPONENTS PART NO.NEA 1402 5A Roof Base 3103633.XXX*Roof Cover 3103634.XXX*Lower Side Vent 3109
18Number Instruction Note00 ——01 LED panel check All LED segments ON02 Battery voltage check ”12” → in range between 8,5 - 18 V DC.“Lo” or “hl” → out
19Put a screwdriver into the slot of the shelf lock.Turn the screwdriver counterclockwise.Remove the shelf locks from the wire shelf.Slide the wire sh
Patents pendingU.S. 10/619,675U.S. 10/620,177U.S. 10/758,174U.S. 10/758,175U.S. 10/760,564U.S. 10/760,565This product is manufactured under license of
20Fuse Type of component3A A, B, D, F, G, N7.5A O, P3A T, (Optional ice maker heat-kit)7.5A U5A ZFUSESRefer to wiring diagram.Fuses from left to right
24MO-FO 0512
3NEA 1402Rear view equipment used for text referenceGENERAL INSTRUCTIONThis appliance is designed for storage of foods andstorage of frozen foods and
4Refrigerator control panelFIG. 212 3 4LEGEND AC ModelPanel Controls:1. Main Power ON/OFF key2. STORE keyPM AC3. LED Display PanelFREEZER FRIDGEThe LE
5INSTALLATIONVENTILATIONThe installation shall be made in such a manner as toprovide necessary air circulation over the cooling unit.Openings for air
6INSTALLING REFRIGERATOR INENCLOSURESecuring the RefrigeratorAfter the refrigerator is put in place, the refrigerator is tobe secured in the enclosure
7Step 2: Two screws installed in the top frame.Open the doors and fasten the refrigerator with twoscrews through the holes underneath the top decorati
8CERTIFIED INSTALLATIONCertified installations require one roof vent and one lowerside vent.For “Certified Vent System Kits” see page 17.For further i
9OPERATINGINSTRUCTIONSIMPORTANCE OF LEVELING AREFRIGERATORIn an absorption refrigerator system, ammonia is lique-fied in the finned condenser coil at
Commentaires sur ces manuels